EIT Group - After Installation of the Panel
EIT sent 7 people for the BAM palace project of Salalah in Oman. A project controler, one designer, and 5 technical people for installation part. EIT sent 7 people for the BAM palace project of Salalah in Oman. A project controler, one designer, and 5 technical people for installation part.
EIT Group - Manufacturing part
After designing and cutting tiles, the tiles should be put together according to the design. This process is very sensitive and should be done very carefuly. Tiles are put beside eachother and fastened bye glue, then they will be one big panel with the cement at the back. After designing and cutting tiles, the tiles should be put together according to the design. This process is very sensitive and should be done very carefuly. Tiles are put beside eachother and fastened bye glue, then they will be one big panel with the cement at the back.
EIT Group - Manufacturing part
After putting the tiles beside each other, it should be fastened to the ground 
because as the cement is put at the back of tiles, it may change or moved. So 
if some of them move, then the surface of the front side tile panel has not a
very flat surface, so it takes too much time to fasten all the tiles to the ground. After putting the tiles beside each other, it should be fastened to the ground because as the cement is put at the back of tiles, it may change or moved. So if some of them move, then the surface of the front side tile panel has not a very flat surface, so it takes too much time to fasten all the tiles to the ground.
EIT Group - Checking Tiles before installation
This picture shows the time cement at the back of the tiles dried 
and becomes a single big panel and ready for the installation
on the wall. This panel is too heavy and needs at least 9 strong man
or a lifting machine to carry to the place of the installation. Since this panel consists of more than 3000 tiles, it should be checked whether a tile is installed in its place right or wrong. This picture shows the time cement at the back of the tiles dried and becomes a single big panel and ready for the installation on the wall. This panel is too heavy and needs at least 9 strong man or a lifting machine to carry to the place of the installation. Since this panel consists of more than 3000 tiles, it should be checked whether a tile is installed in its place right or wrong.

ٍ English     فارسی
All EIT Site
Home
Products
Contact Us
About Us
News

Simple Seven-color tile
Moarragh Tiles
Mogharnas Tiles
Gereh
EIT Group
EIT Working Conditions

:: Erfan International Tile Co.

 Copyright . All right reserved by A2S Company 2007- 2008